Life has been very busy lately, so progress has been extremely slow. Despite this, I did get some noticeable work done, which was constructing the new section to the small town of Northport, WA. This included building intricate benchwork to accommodate for a future staging yard under the shelf, laying roadbed, building turnouts, laying track, and wiring. Everything is complete except for the trackwork and wiring, which only includes the main line and a passing siding in Northport. One other thing I had to construct before progress could continue, was an 80' long pile trestle to closely match a few of the small ones the BN had along the Columbia River. This bridge is freelanced, but is fairly close to the prototypes except just shorter length wise and in height.
Here are a few photos of the pile trestle.
Here's some more overall shorts of this Columbia River scene.
Here's a few prototype photos of this area. They are not taken at the exact locations that I'm trying to model in this short scene, but hopefully you'll understand the ''feel'' I'm striving for.
Bill Hooper photos:
Marty Bernard Photos of the Kettle Falls International RR:
As we wrap around the corner, the line goes through the small town of Northport, WA. This town was home to an enormous smelter and saw mill and pole mill. This is also where the Red Mountain RR interchanged with the Spokane Falls & Northern RR in the early 1900's. There is also a wye here for turning around the steam locomotives. In the 80's, there wasn't much action. The smelter burned down before the 80's and a lot of the other little industries went out of business. Since there isn't much info about Northport in the 80's, I took the liberty to freelance a little, involving the industries that I would like to model. I don't have much space for this town so, I can't include everything, but I want to model the depot area (the depot is already made), the pole mill, MOW track, ore dump track, passing siding, and possibly a team track or oil dealer.
Here's what I've got so far.
Here's a blueprint Mr. Bob Kelly from the Great Northern Historical Society sent me. Thanks Bob!
Well, that concludes this update. My dad and have been working on putting tile in this room lately which should be done here soon. I can't wait! The current flooring is bare concrete, which is horrible in appearance and it creates SO much dust. I know tile isn't the best material to use in a train room because it is hard on the feet when standing and it's also really cold, but my parents are paying for it, thus they get their way.
Modeling the Burlington Northern Railroad in the early 1980's from Kettle Falls, WA to Salmo, British Columbia
Salmo Local leaving Kettle Falls yard
Showing posts with label Nelson Sub. Show all posts
Showing posts with label Nelson Sub. Show all posts
Thursday, December 19, 2013
Wednesday, October 9, 2013
Progress Update #4
Hi Everyone. School and sports have really been eating my time, but I did get a few things done on the layout.
The first thing I've been working on is planning the track work, scenery, structures, etc.. I haven't actually laid any track yet because I'm waiting til the next module up so I can make sure radius' and turnouts will fit properly. Despite this, I did plan the scene. I decided to model one of the few curved wooden pile trestles along the Columbia River towards the town of Northport. My plan is to have the track snake along the river and cross the bridge and jut back out to the edge of the layout. Hopefully this will make a 'shadow box' effect to chop up the scenes. Please excuse the crude drawing!
The first thing I've been working on is planning the track work, scenery, structures, etc.. I haven't actually laid any track yet because I'm waiting til the next module up so I can make sure radius' and turnouts will fit properly. Despite this, I did plan the scene. I decided to model one of the few curved wooden pile trestles along the Columbia River towards the town of Northport. My plan is to have the track snake along the river and cross the bridge and jut back out to the edge of the layout. Hopefully this will make a 'shadow box' effect to chop up the scenes. Please excuse the crude drawing!
Prototype by: Bill Hooper
Model
The next thing I did on the layout was actually start painting my backdrop. I had always been scared to even try backdrop painting, but one I just thought I should go for it. So I did! I got a few photos off of the internet and planned what I was going to do. After that I started painting. I painted the background hills and trees. The only thing left to paint is grassy, rolling hills which will in the fore-ground of the backdrop. I like the result, but it doesn't match the prototype photos as closely as I had hoped. I can always repaint it! Please give me any suggestions you might have.
Prototype/ sorry about the quality
Model
The other thing(s) I did on the layout, was work on building a few of the structures for my locomotive facility in Kettle Falls. This included a sanding tower and a fuel tank. I could of bought these as kits from Pike stuff or Walthers, but I was striving for more of a backwoods/ branch line look. By the way, I have no prototype info about these structures in Kettle Falls, so they are completely 'proto-freelanced', since they are built after BN prototypes, just in a different location.
The sanding tower was built with styrene 'I' beams, strip wood, brass wire, and a tube that solder comes in.
Sanding Tower:
Prototype by: Martin Duwash
Model:
For the fuel tank, I unfortunately lost the prototype photo. Anyway, the model is made from a 3/4" PVC pipe, wood for concrete pillars to enhance the appearance of layered concrete, and various other little details mainly made of sprues and old freight car parts. The weathering turned out REALLY bad in my opinion, so I still have to fix that. Once I finalize where I'm going to put the model, I'll build a concrete pad, but until then, there isn't one.
The last thing I did on the layout was add speeder tracks to my speeder shed and build a speeder from a Durango Press kit. This was a fun, yet very simple kit to build. I still have to do some touch-up paint on it, but overall it turned out well.
So, that's about it.
Tuesday, September 3, 2013
Progress Update #3
My Summer was really busy, so not much got done on the layout. I did work on quite a bit of details and I finished the wood chip loading spur for the Boise Cascade lumber mill in Kettle Falls. The wood chip loading facility included a heavily kitbashed loader made from a cheap model power sand mine kit and a scratchbuilt auger shed and loading pit for trucks or front end loaders to dump chips in. The details included scratchbuilt power poles, a corrugated metal fence for the grain complex, and some little details around the depot. Another thing I did was I found a new candidate for trees. I was watering our garden when I noticed our oregano plant had some extremely nice looking blossoms that could be used for deciduous trees. That only problem is that it is very fragrant!
Here's just an overview of the layout. I'm in the process of building more bench work. I'll keep you updated on that.
Saturday, June 1, 2013
Train Pics....
Here's some photos of the Kettle Falls Switcher with a load bound for the Boise Cascade Lumber mill just outside the Kettle Falls yard limits.
Subscribe to:
Posts (Atom)








